Parc Meridian
12.10.2015
Construction on Parc Meridian is in progress and the design is taking shape! Last week we visited the site to assess the aquatic plant install and arrived as the dam was being removed to fill the on-site pond.
This pond will function as a publicly accessible open space and naturalized habitat for urban wildlife while achieving stormwater management functions. It will act as a BMP for 65 acres of surrounding community!
We designed the shoreline using native plants that have adapted to saturated soil and submerged conditions while possessing the versatility to withstand intermittent large storm events.