Parc Meridian

12.10.2015

Construction on Parc Meridian is in progress and the design is taking shape! Last week we visited the site to assess the aquatic plant install and arrived as the dam was being removed to fill the on-site pond.

This pond will function as a publicly accessible open space and naturalized habitat for urban wildlife while achieving stormwater management functions.  It will act as a BMP for 65 acres of surrounding community!

We designed the shoreline using native plants that have adapted to saturated soil and submerged conditions while possessing the versatility to withstand intermittent large storm events.

IMG_9827

Here is a look at the boardwalk over the retention pond

IMG_9828

Some of the aquatic plants that were installed on site

IMG_9837

One of the public art installations: ducks landing on the pond